Brownfield Investment Proposal Industrial Plot/Production Area

  1. Name of industrial plot/production area
    Vacant production areas of Kamianets-Podilskyi Plant “Elektron”, ALC (Additional Liability Company)
  2. Location
    Street: Marshala Kharchenko, 22b
    District (locality) Geographical coordinates: Kamianets-Podilsyi, 48°40′50 ″ North latitude, 26°34′50 ″ East longtitude
    Industrial property object
    Building No. 2 (production building, 4-storied): fitting and assembly factory, sewing factory
    Building No. 8 (production): machining, framing-stamping, fitting and assembly factory
    Website: www.plant-electron.net
  3. Owner of the object
    Kamianets-Podilskyi Plant “Elektron”, ALC
    3.1. Contact person
    Last name, first name, patronymic: General Director Vozniuk Anatolii Oleksandrovych
    tel.: (03849) 3-33-12,
    cell.: +380503768146
    e-mail: pat.electron@ukr.net
  4. Basic information about industrial plot/production area
    4.1. Usable area
    Area: 24570 m2
    Number of floors: 8
    Height: 5.5 m
    Year of construction: 1968
    4.2. Available technical conditions
    average
    4.3. Total area of the plot of land: 142000 m2
  5. Transport connection
    nearest highway
    road number and distance to it in km
    road of national importance, 0.02, Highway of national and European importance (European Route E85)
    name of a regional center and distance to it in km
    nearest regional center: 100 km, city of Khmelnytskyi, and 100 km, city of Chernivtsi
    name of the nearest airport and distance to it in km
    nearest international airport – 100 km, Chernivtsi International Airport
  6. Infrastructure
    Electric power supply
    Sewage systems
    Water supply
    Access to roads for trucks
    Gas supply
    Heating
  1. Use/purchase conditions
    Ownership
    Permanent use
    Lease
    Joint activity
  2. Additional information (current state of affairs, possibility of state support, etc.)
    The company offers as follows:
  • formation of joint ventures, both in the existing areas of production and technologies, and for the implementation of other new technologies in vacant areas;
  • complete requalification of the company;
  • lease of production and warehouse premises

    Proposal prepared by: General Director Vozniuk Anatolii Oleksandrovych
    (full name, position)